What a site survey tells us
Walls are never square. A morning with a laser, a level and a notebook saves weeks later.
Priya Shah
Project architect
4 min read

Every project starts with a survey, even when the client has drawings. Drawings show what was meant; a survey shows what was built.
What we measure
Every wall at three heights, every floor at a dozen points, every opening, socket and pipe. We note which walls are hollow and which will take the weight of a library.
What we look for
Damp, movement cracks and the route of services. A wall that leans by fifteen millimetres changes how a tall cupboard is built, so we would rather know on day one.
Keep reading

Process
Why we draw every room twice
Once on paper, once in the workshop. The second drawing is the one that fits.

Materials
How we build a sample board
Real offcuts, real light, one board per room: how a finish schedule becomes something you can hold.

Process
The shadow gap, explained
Why we leave a few millimetres of shadow where joinery meets a wall, and why it ages better than a bead of silicone.